Engineering in Devils Lake, North Dakota
Construction Projects
2023
2023 Construction Season Project Map
City of Devils Lake
City Project 230101 – Subgrade Repair and Gravel Overlay
Project consists of subgrade repair and gravel overlay along 14th St NE from east of 5th Ave NE to 14th Ave NE and 14th Ave NE from north of 10th St NE to 14th St NE. Project is scheduled to be bid May 12th, 2023. As part of the project, 14th St NE will be closed for short duration to allow for the subgrade repair work to be completed. The remainder of the work will be completed with short, minimal disruptions to traffic. Work is expected to begin this summer and be completed this year. Project schedule will be updated as it becomes available.
City Project 220201 – Water Main Replacement
Project consists of the replacement of an existing cast iron water main with new poly pipe along 10th St NW, 11th St NW, 12th St NW & 13th St NW between College Dr N and 4th Ave NW. Kemper Construction began work on this project in 2022 and completed work along 10th St NW and 11th St NW. Kemper Construction will be completing the remainder of this work this summer and will be providing temporary water services to affected residents during the water main replacement process. Affected residents will be notified as the project progresses. Work is expected to begin early this summer and be completed mid-summer. Project schedule will be updated as it becomes available.
City Project 230201 – Water Main Replacement
Project consists of the replacement of an existing cast iron water main with new poly pipe along 2nd St NE from 6th Ave NE to 12th Ave NE, 3rd St SE from College Dr N to 3rd Ave SE, 4th St SE from College Dr N to 6th Ave SE, 5th St SE from 5th Ave SE to 8th Ave SE, 6th St SE from 6th Ave SE to 8th Ave SE, 6th Ave SE from 5th St SE to 4th St SE, 7th Ave SE from 5th St SE to 3rd St SE and 8th Ave SE from 7th St SE to 5th St SE. Kemper Construction will be completing the work and will be providing temporary water services to affected residents during the water main replacement. Affected residents will be notified as the project progresses. This project has a final completion date of Fall 2024 and the project start date has yet to be determined. Project schedule will be updated as it becomes available.
City Project 230301 – Storm Sewer Improvements
Construction crews will be completing the installation of storm sewer along 13th Ave SE and between 15th St SE and 16th St SE to help improve drainage in the Stromquist area. The project was bid last summer, but was rejected due to high bids and re-bid this spring. DL Barkie Construction will be completing the work this summer and all work will take place in the public right of way and City utility easements, which will cause minimal disruptions to traffic or adjacent properties. Project schedule will be updated as it becomes available.
2022
Category: Engineering
More Engineering